Tullow Oil (Phase 2), Dublin 18

Overview

Tullow Oil PLC. The oil and gas exploration company relocated its headquarters to Central Park. The office area is located in Number One Central Park in Leopardstown Dublin. Additional hot desk office space and media conference rooms were required due to growing business opportunities and an additional requirement for remotely hosted conferences. As a result additional floor space within the same building was chosen to facilitate the needs of the business.

The well-established relationship between Tullow Oil PLC and their supplier was enforced when Designer Group returned to complete the fit-out works for phase two of their offices in Central Park. Having already carried out both phase one and the shell and core installations the Group was familiar with the product the client desired. This project differed from phase one as the installation was dominated by the extensive audio visual room requirements that were required.

View more on Google Plus

Designer Group carried out installation of the following services

Mechanical Installation

  • Full secondary ducting installation for treated air throughout the office space
  • Sound attenuation equipment
  • Low pressure hot water system
  • Four pipe fan coil installation
  • Supply and installation of mechanical chiller units
  • Complete supply and installation of a Group Schneider BMS system
  • Air treatment works for the communication room

Electrical Installation

  • L1 addressable fire alarm system throughout
  • Disabled support systems, accessible accessories, toilet alarms, refuge systems etc.
  • Extensive power distribution systems using a busbar system in the raised access floor
  • Low voltage switchgear arrangement
  • Extensive web enabled audio visual installation of media and conference rooms
  • Centrally controlled addressable lighting system
  • Programmable access control system

Project Details

Tullow Oil PLC
€1.85M