SUEZ Gasification Building and Office Fit Out Surrey, TW17, United Kingdom

SUEZ

Description: Gasification Building and Office Fit Out

The innovative new Eco Park is being developed by SUEZ as part of its 25-year PFI contract with Surrey County Council.  They will take general waste, collected from homes in Northern Surrey and from some local businesses, into this processing plant which incorporates Anaerobic Digestion to process some 40,000 tonnes of food waste and the latest fluidised bed gasification technology producing syngas from Refuse Derived Fuel to provide 35MWe energy to the national grid, enough to power up to 8,000 homes.

Under this contract Designer Group will be responsible for the electrical design, supply and installation works to the new gasification building.  The works consist of new power and control cabling, emergency generator systems, UPS, ladder containment, earthing, lighting and small power.

More Details

Designer Group are responsible for the following Mechanical and Electrical Services on this project:
Mechanical Services

  • VRV System
  • Extract System
  • Ventilation Systems c/w attenuators
  • BMS Systems
  • LTHW and Domestic Systems
  • Drainage and Waste Systems
  • Air Conditioning Systems
  • Trench Heating System
  • Sanitary Ware Installation
  • Chlorination
  • Water Booster Sets

Electrical Services

  • HV/LV Containment Systems
  • HV Infrastructure
  • HV Return Path to National Grid
  • LV Infrastructure
  • Controls to Infrastructure
  • Data Installation
  • Lighting & Power Installation
  • Earthing Systems
  • UPS Systems
  • Generator Installation

Project Details

M + W Group
£9.1m