Heathrow Airport – T2B VCC Heathrow Airport, London, TW6

Heathrow Airport

This project at Heathrow Airport consists of the M&E fit out of the new Vertical Circulation Core in building 234. Works are within the live operational terminal and the existing plant is to be kept operational until new the roof plant AHU is installed and commissioned.

Designer Group’s involvement in this project consists of power to new lifts, new escalators, lighting masts, lightning protection, general power / lighting and lighting control.

Heathrow Airport, Terminal 2 VCC is an 82-week long programme which started on site in September 2019.

More Details

Designer Group are responsible for all Mechanical and Electrical Services comprising of:
Mechanical Services

  • Ductwork
  • LTHW
  • CHW
  • Trench Heating
  • New AHU

Electrical Services

  • LV Panel
  • Lightning Protection
  • General Power
  • Lighting
  • Lighting Control
  • Site Temps

 

Project Details

Balfour Beatty Construction
£1.2M

Latest Projects