Diageo Meta Abo Power Infrastructure Project Sebeta, Ethiopia

Diageo Meta Abo Power Infrastructure Project

Designer Group’s Role:

Further to Diageo’s acquisition of Meta Abo Brewery in Addis Ababa from the Ethiopian state, there followed a significant capital investment to bring the brewery up to current Western standards and increase production. Designer Group were employed on a design to upgrade the current main mechanical power infrastructure for the plant. This involved full replacement of MCC panels along with power and control wiring for all utilities on site. Subsequent to the successful delivery of this project, Designer Group were successful in winning the  G5 Power Generation & High voltage infrastructure project. This project included Diesel Power Generation,  24KV switch gear, HV cabling and modifications and upgrades to main power infrastructure control systems.

Designer Group completed the following services

Services Completed

  • Infrastructure for brewery including new WWTP and WTP
  • Design and Build Service
  • Power generation
  • High Voltage and Low voltage infrastructure

Project Details

Diageo
Undisclosed NDA