Applegreen Service Stations M1 Castlebellingham North & South, M1 Lusk North & South, and M4 Enfield East & West.

Overview

Applegreen, an independent forecourt retailer with over 80 sites in the UK and Ireland, is a familiar site along our motorways. Designer Group completed the mechanical installation to six of the motorway flagship service stations in 2010. The stations’ construction followed a modular path. Designer Group delivered the labour intensive plant rooms in each station as prefabricated units. The projects ran concurrently, therefore the plant rooms were produced at the same time.

The result was a uniform fit-out for the plant room areas with minimum waste. The works included a full fit-out of the stations’ forecourt and retail areas. Stations in the project included Applegreen Service Stations M1 Castlebellingham North & South, M1 Lusk North & South, and M4 Enfield East & West.

More Details

Designer Group carried out installation of the following services

Electrical and Process Engineering Installation

  • Prefabricated plant room per unit consisting of gas fired LPHW, Boilers, CHP and pump sets
  • Interface with third party contractors, gas, water and drainage
  • Mechanical fresh air heat recovery ventilation system
  • LPHW radiator heating system
  • Building management system

Project Details

Applegreen
€1.8M