Slide background
1 Georges Quay
1GQ is a landmark, multi-storey waterfront office building in the prime city centre location of Dublin 2. It was the former headquarters for Ulster Bank until 2016 and has been redeveloped for Irish Life. The scope of the electrical works carried out by Designer Group comprised the isolation, full strip out, refurbishment and electrical installation to upgrade Blocks C and D, including basement and roof plant areas. The 3rd floor was completed to CAT A standard. Particular
Slide background
University College Dublin

University College Dublin (UCD) is one of Europe’s leading research-intensive universities. Designer Group carried out the mechanical and electrical installation within the brand new state of the art student centre; providing space for additional student support, leisure and a diverse range of cultural facilities such as a swimming pool, fitness centre, media centre/radio studio and café space. The overall building design mixes an industrial robust infrastructure with a modern vibrant interactive fit-out

Slide background
Co-op Distribution centre

The Co-operative Group is the UK’s largest mutual business, owned not by private shareholders but by over six million consumers. Designer Group carried out the full mechanical and electrical design and build installation to the new 33-acre distribution centre in Bristol, United Kingdom. The site provides a mix of office, warehousing and distribution accommodation for The Co-operative and accommodates a vehicle maintenance unit, energy centre and parking for 270 commercial lorries.

Slide background
The O2
Project Mint

Located on the northern tip of Greenwich Peninsula, Project Mint is the 360 degree designer outlet centre within the O2 Arena, occupying the remaining empty space inside the entertainment district. Designer Group was appointed by ISG to complete the shell and core Mechanical, Electrical and Plumbing (MEP) services to facilitate 81 new high end retail units.

Slide background
St Thomas Hospital
(PET Centre)

Designer Group worked on both phases of the PET Centre at St Thomas Hospital project. Aimed to revolutionise PET Imaging facilities, Designer Group were appointed to install the full Mechanical Electrical Plumbing (MEP) works to the new PET Centre Facility including Medical Gases and a new nuclear grade ductwork installation. Phase Two involves the construction works associated with the installation of a second cyclotron acceleration plant, hot cells and associated equipment capable of producing a range of imaging tracers to enable enhanced diagnostic care and improved research capability.

Slide background
One Blackfriars
London

One Blackfriars Road was previously the Sainsbury’s Group Headquarters. The new development comprised of commercial space on the bottom floor, a hotel on the 3 lower levels, 274 homes on the upper floors and a viewing platform on the 32nd Floor. Designer Group carried out the mechanical, electrical and plumbing services package for the shell and core in the Tower, and the fit out of the four star hotel section.

Learn how Designer Group use cutting edge Building Information Modeling technology to enhance the management of construction through simulation within a 3D virtual environment

About Us

Our people and our client relationships are the twin foundations we built and continue to grow our business on. We are extremely proud of our workforce. We have invested heavily in staff training to place us at the leading edge in what is a rapidly changing industry. This investment has produced an innovative and passionate team that deliver projects for our clients safely, efficiently and to the highest standards in the industry.

We place a huge importance in learning about our clients’ requirements and adapting to their needs.

Follow Us Online

 

Our Vision

Our vision is to be a partner of choice in long term relationships while working collaboratively to deliver project solutions for mutual benefit.

Access Designer Group Intranet

View Interactive Brochures

 

Current Projects

As an industry leader, Designer Group works with some of the world’s largest multinational companies View some of our Current Projects

 

Search Designer

Need some information? Find it fast below. Simply type in your search query and hit enter.

 

Health & Safety

Safety is our number one priority as a business and is embedded in our culture, behaviour and process.